ChargeCensus

Thomas College

Available

EV charging station in Waterville, Maine, not on a charging network — 2 Level 2 · 2 Level 1. US DOE AFDC station 62735.

At a glance

Thomas College is a public EV charging station at 180 W River Rd in Waterville, Maine, not attached to a charging network. It has 4 charging ports (2 Level 2 · 2 Level 1) with J1772 and NEMA 5-20 connectors. The US DOE registry lists it as available, open since Dec 1, 2013.

Total ports
4
DC fast
0
Level 2
2
Access
Public
workplace charging
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID62735
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityCollege campus
Open dateDec 1, 2013
Last updated at sourceMay 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • NEMA 5-20 — 20A 120V wall outlet.

Pricing: Free; parking fee

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
180 W River Rd
City
Waterville
State
Maine
ZIP
04901
Coordinates
44.52350, -69.66301

Within ~15 km

Nearby charging

What kind of charging does Thomas College offer?

Of its 4 ports, 2 are Level 2 and 2 are Level 1. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. Level 1 ports are standard 120-volt outlets, the slowest way to charge. That is about 58% above the Maine average of 2.5 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; NEMA 5-20, 20A 120V wall outlet. Pricing as reported to the registry: “Free; parking fee”. The site is listed as a college campus location. It is flagged as workplace charging.

How does Thomas College compare with other stations in Waterville?

Waterville has 6 charging stations in the DOE registry with 24 ports, the 24th-most of 136 cities and towns in Maine. Thomas College accounts for 17% of the charging ports in Waterville. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.

Who operates Thomas College?

Thomas College is listed as non-networked: its chargers are not run through a charging-network account. Maine has 140 non-networked stations, 20% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 1, 2013. The station's record was last updated at the source on May 12, 2026.

Frequently asked questions

How many chargers does Thomas College have?

Thomas College has 4 charging ports: 2 Level 2 · 2 Level 1.

Does Thomas College have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are 2 Level 2 · 2 Level 1.

What connectors does Thomas College have?

Thomas College has J1772 and NEMA 5-20 connectors.

Is charging at Thomas College free?

Pricing as reported to the DOE registry: Free; parking fee.

Is Thomas College open to the public?

Yes. Thomas College is listed with public access, and its status is available.

Where is Thomas College?

Thomas College is at 180 W River Rd, Waterville, ME 04901. Its coordinates are 44.52350, -69.66301.

More EV charging around Waterville

Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 62735, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Thomas College, Waterville, ME (AFDC station 62735)”, https://chargecensus.com/stations/maine/thomas-college-62735 (data as of October 12, 2026).