The Beacon at Gateway
AvailableEV charging station in Scarborough, Maine on the AmpUp network — 4 Level 2. US DOE AFDC station 319405.
At a glance
The Beacon at Gateway is a public EV charging station at 100 Gateway Blvd in Scarborough, Maine, on the AmpUp network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 30, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 319405 |
| Network | AmpUp |
| Status | Available (E) |
| Access | Public |
| Facility | Multi-unit dwelling |
| Open date | Jun 30, 2023 |
| Last updated at source | Oct 8, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $0.40 per kWh
Location
- Address
- 100 Gateway Blvd
- City
- Scarborough
- State
- Maine
- ZIP
- 04074
- Coordinates
- 43.59911, -70.36466
Within ~15 km
Nearby charging
- USM Parking Garage58 ports
Blink · Available
- Dougherty Commons18 ports
Red E · Available
Tesla Supercharger · Available
- Industrial Park Saco MB.HPC12 ports
Mercedes-Benz HPC · Available
- Unum12 ports
Non-networked · Available
Tesla Supercharger · Available
What kind of charging does The Beacon at Gateway offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 58% above the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.40 per kWh”. The site is listed as a multi-unit dwelling location.
How does The Beacon at Gateway compare with other stations in Scarborough?
Scarborough has 22 charging stations in the DOE registry with 57 ports, the 5th-most of 136 cities and towns in Maine. The Beacon at Gateway accounts for 7% of the charging ports in Scarborough. AmpUp runs 2 stations in Scarborough. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates The Beacon at Gateway?
AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 14 of those stations are in Maine, 2% of the state's 694.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 30, 2023, one of 99 stations in Maine with a 2023 open date. The station's record was last updated at the source on Oct 8, 2026.
Frequently asked questions
How many chargers does The Beacon at Gateway have?
The Beacon at Gateway has 4 charging ports: 4 Level 2.
Does The Beacon at Gateway have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does The Beacon at Gateway have?
The Beacon at Gateway has J1772 connectors.
Is charging at The Beacon at Gateway free?
Pricing as reported to the DOE registry: $0.40 per kWh.
Is The Beacon at Gateway open to the public?
Yes. The Beacon at Gateway is listed with public access, and its status is available.
Where is The Beacon at Gateway?
The Beacon at Gateway is at 100 Gateway Blvd, Scarborough, ME 04074. Its coordinates are 43.59911, -70.36466.
More EV charging around Scarborough
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 319405, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Beacon at Gateway, Scarborough, ME (AFDC station 319405)”, https://chargecensus.com/stations/maine/the-beacon-at-gateway-319405 (data as of October 12, 2026).