Sundog Solar
AvailableEV charging station in Searsport, Maine, not on a charging network — 1 Level 2. US DOE AFDC station 87646.
At a glance
Sundog Solar is a public EV charging station at 222 E Main St in Searsport, Maine, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 1, 2017.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 87646 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Office building |
| Open date | Sep 1, 2017 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 222 E Main St
- City
- Searsport
- State
- Maine
- ZIP
- 04974
- Coordinates
- 44.46541, -68.90234
Within ~15 km
Nearby charging
- Sundog FastCharge4 ports
Non-networked · Available
Tesla Destination · Available
- Maine Maritime Academy2 ports
OpConnect · Available
- Quirk Ford of Belfast2 ports
Ford Charge · Available
ChargePoint · Available
ChargePoint · Available
What kind of charging does Sundog Solar offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a office building location.
How does Sundog Solar compare with other stations in Searsport?
Searsport has 3 charging stations in the DOE registry with 7 ports. Sundog Solar accounts for 14% of the charging ports in Searsport. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates Sundog Solar?
Sundog Solar is listed as non-networked: its chargers are not run through a charging-network account. Maine has 140 non-networked stations, 20% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 1, 2017, one of 8 stations in Maine with a 2017 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Sundog Solar have?
Sundog Solar has 1 charging port: 1 Level 2.
Does Sundog Solar have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Sundog Solar have?
Sundog Solar has J1772 connectors.
Is charging at Sundog Solar free?
Pricing as reported to the DOE registry: Free.
Is Sundog Solar open to the public?
Yes. Sundog Solar is listed with public access, and its status is available.
Where is Sundog Solar?
Sundog Solar is at 222 E Main St, Searsport, ME 04974. Its coordinates are 44.46541, -68.90234.
More EV charging around Searsport
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 87646, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sundog Solar, Searsport, ME (AFDC station 87646)”, https://chargecensus.com/stations/maine/sundog-solar-87646 (data as of October 12, 2026).