ChargeCensus

SMCC Sustainable Center

Available

EV charging station in South Portland, Maine, not on a charging network — 1 Level 2. US DOE AFDC station 218035.

At a glance

SMCC Sustainable Center is a public EV charging station at 2 Fort Rd in South Portland, Maine, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 9, 2022.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID218035
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateMay 9, 2022
Last updated at sourceMay 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
2 Fort Rd
State
Maine
ZIP
04106
Coordinates
43.64914, -70.22758

Within ~15 km

Nearby charging

What kind of charging does SMCC Sustainable Center offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.

How does SMCC Sustainable Center compare with other stations in South Portland?

South Portland has 27 charging stations in the DOE registry with 57 ports, the 3rd-most of 136 cities and towns in Maine. SMCC Sustainable Center accounts for 2% of the charging ports in South Portland. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.

Who operates SMCC Sustainable Center?

SMCC Sustainable Center is listed as non-networked: its chargers are not run through a charging-network account. Maine has 140 non-networked stations, 20% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 9, 2022, one of 98 stations in Maine with a 2022 open date. The station's record was last updated at the source on May 12, 2026.

Frequently asked questions

How many chargers does SMCC Sustainable Center have?

SMCC Sustainable Center has 1 charging port: 1 Level 2.

Does SMCC Sustainable Center have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does SMCC Sustainable Center have?

SMCC Sustainable Center has J1772 connectors.

Is SMCC Sustainable Center open to the public?

Yes. SMCC Sustainable Center is listed with public access, and its status is available.

Where is SMCC Sustainable Center?

SMCC Sustainable Center is at 2 Fort Rd, South Portland, ME 04106. Its coordinates are 43.64914, -70.22758.

More EV charging around South Portland

Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 218035, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “SMCC Sustainable Center, South Portland, ME (AFDC station 218035)”, https://chargecensus.com/stations/maine/smcc-sustainable-center-218035 (data as of October 12, 2026).