Pickering Station 1
AvailableEV charging station in Bangor, Maine on the ChargePoint network — 2 Level 2. US DOE AFDC station 439709.
At a glance
Pickering Station 1 is a public EV charging station at 100 Broad Street in Bangor, Maine, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 5, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 439709 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 5, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Bangor MB.HPC8 ports
Mercedes-Benz HPC · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Brewer, ME6 ports
Rivian Adventure Network · Available
- Airport Mall4 ports
Jule · Available
What kind of charging does Pickering Station 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Pickering Station 1 compare with other stations in Bangor?
Bangor has 23 charging stations in the DOE registry with 58 ports, the 4th-most of 136 cities and towns in Maine. Pickering Station 1 accounts for 3% of the charging ports in Bangor. ChargePoint runs 14 stations in Bangor. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates Pickering Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 333 of those stations are in Maine, 48% of the state's 694.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 5, 2025, one of 150 stations in Maine with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pickering Station 1 have?
Pickering Station 1 has 2 charging ports: 2 Level 2.
Does Pickering Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Pickering Station 1 have?
Pickering Station 1 has J1772 connectors.
Is Pickering Station 1 open to the public?
Yes. Pickering Station 1 is listed with public access, and its status is available.
Where is Pickering Station 1?
Pickering Station 1 is at 100 Broad Street, Bangor, ME 04401. Its coordinates are 44.79977, -68.77034.
More EV charging around Bangor
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 439709, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pickering Station 1, Bangor, ME (AFDC station 439709)”, https://chargecensus.com/stations/maine/pickering-station-1-439709 (data as of October 12, 2026).