Parks and Recreations, SACO
AvailableEV charging station in Saco, Maine on the FLO network — 2 Level 2. US DOE AFDC station 372110.
At a glance
Parks and Recreations, SACO is a public EV charging station at 75 Franklin St in Saco, Maine, on the FLO network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 28, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 372110 |
| Network | FLO |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 28, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Unum12 ports
Non-networked · Available
Tesla Supercharger · Available
- Industrial Park Saco MB.HPC12 ports
Mercedes-Benz HPC · Available
Non-networked · Available
Tesla Supercharger · Available
- Target - Tesla Supercharger8 ports
Tesla Supercharger · Available
What kind of charging does Parks and Recreations, SACO offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Parks and Recreations, SACO compare with other stations in Saco?
Saco has 13 charging stations in the DOE registry with 41 ports, the 14th-most of 136 cities and towns in Maine. Parks and Recreations, SACO accounts for 5% of the charging ports in Saco. It is the only FLO station in Saco. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates Parks and Recreations, SACO?
FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 8 of those stations are in Maine, 1% of the state's 694.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 28, 2024, one of 70 stations in Maine with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Parks and Recreations, SACO have?
Parks and Recreations, SACO has 2 charging ports: 2 Level 2.
Does Parks and Recreations, SACO have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Parks and Recreations, SACO have?
Parks and Recreations, SACO has J1772 connectors.
Is Parks and Recreations, SACO open to the public?
Yes. Parks and Recreations, SACO is listed with public access, and its status is available.
Where is Parks and Recreations, SACO?
Parks and Recreations, SACO is at 75 Franklin St, Saco, ME 04072. Its coordinates are 43.50897, -70.45285.
More EV charging around Saco
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 372110, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Parks and Recreations, SACO, Saco, ME (AFDC station 372110)”, https://chargecensus.com/stations/maine/parks-and-recreations-saco-372110 (data as of October 12, 2026).