Mdot Rockland Ferry
AvailableEV charging station in Rockland, Maine on the ChargePoint network — 2 Level 2. US DOE AFDC station 201911.
At a glance
Mdot Rockland Ferry is a public EV charging station at 517 Main St in Rockland, Maine, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 2, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 201911 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 2, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 517 Main St
- City
- Rockland
- State
- Maine
- ZIP
- 04841
- Coordinates
- 44.10706, -69.10816
Within ~15 km
Nearby charging
- Samoset Resort9 ports
Blink · Available
Tesla Supercharger · Available
- Camden Hills State Park6 ports
Non-networked · Available
- Ew Charge Mechanic-St-12 ports
ChargePoint · Available
- Key Ford - Rockland2 ports
Non-networked · Available
- Town of Thomaston2 ports
Non-networked · Available
What kind of charging does Mdot Rockland Ferry offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mdot Rockland Ferry compare with other stations in Rockland?
Rockland has 6 charging stations in the DOE registry with 18 ports. Mdot Rockland Ferry accounts for 11% of the charging ports in Rockland. ChargePoint runs 3 stations in Rockland. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates Mdot Rockland Ferry?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 333 of those stations are in Maine, 48% of the state's 694.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 2, 2021, one of 59 stations in Maine with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mdot Rockland Ferry have?
Mdot Rockland Ferry has 2 charging ports: 2 Level 2.
Does Mdot Rockland Ferry have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Mdot Rockland Ferry have?
Mdot Rockland Ferry has J1772 connectors.
Is Mdot Rockland Ferry open to the public?
Yes. Mdot Rockland Ferry is listed with public access, and its status is available.
Where is Mdot Rockland Ferry?
Mdot Rockland Ferry is at 517 Main St, Rockland, ME 04841. Its coordinates are 44.10706, -69.10816.
More EV charging around Rockland
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 201911, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mdot Rockland Ferry, Rockland, ME (AFDC station 201911)”, https://chargecensus.com/stations/maine/mdot-rockland-ferry-201911 (data as of October 12, 2026).