Ironsides Station 3
AvailableEV charging station in Saco, Maine on the ChargePoint network — 2 Level 2. US DOE AFDC station 391611.
At a glance
Ironsides Station 3 is a public EV charging station at 15 Lund Road in Saco, Maine, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 2, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 391611 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 2, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Unum12 ports
Non-networked · Available
Tesla Supercharger · Available
- Industrial Park Saco MB.HPC12 ports
Mercedes-Benz HPC · Available
Non-networked · Available
Tesla Supercharger · Available
- Target - Tesla Supercharger8 ports
Tesla Supercharger · Available
What kind of charging does Ironsides Station 3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ironsides Station 3 compare with other stations in Saco?
Saco has 13 charging stations in the DOE registry with 41 ports, the 14th-most of 136 cities and towns in Maine. Ironsides Station 3 accounts for 5% of the charging ports in Saco. ChargePoint runs 8 stations in Saco. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates Ironsides Station 3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 333 of those stations are in Maine, 48% of the state's 694.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 2, 2025, one of 150 stations in Maine with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ironsides Station 3 have?
Ironsides Station 3 has 2 charging ports: 2 Level 2.
Does Ironsides Station 3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Ironsides Station 3 have?
Ironsides Station 3 has J1772 connectors.
Is Ironsides Station 3 open to the public?
Yes. Ironsides Station 3 is listed with public access, and its status is available.
Where is Ironsides Station 3?
Ironsides Station 3 is at 15 Lund Road, Saco, ME 04072. Its coordinates are 43.52172, -70.45209.
More EV charging around Saco
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 391611, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ironsides Station 3, Saco, ME (AFDC station 391611)”, https://chargecensus.com/stations/maine/ironsides-station-3-391611 (data as of October 12, 2026).