Gowell Shop and Save Greene ME
AvailableEV charging station in Greene, Maine on the Red E network — 2 Level 2. US DOE AFDC station 351280.
At a glance
Gowell Shop and Save Greene ME is a public EV charging station at 440 US-202 in Greene, Maine, on the Red E network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 16, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 351280 |
| Network | Red E |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Jul 16, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 440 US-202
- City
- Greene
- State
- Maine
- ZIP
- 04325
- Coordinates
- 44.18428, -70.16236
Within ~15 km
Nearby charging
- Rowe Auburn4 ports
Ford Charge · Available
- Lee Nissan Auburn Service3 ports
Non-networked · Available
- Auburnme Pal12 ports
ChargePoint · Available
Non-networked · Available
- Auburnme Pggf22 ports
ChargePoint · Available
- Auburnme Pggf12 ports
ChargePoint · Available
What kind of charging does Gowell Shop and Save Greene ME offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.
How does Gowell Shop and Save Greene ME compare with other stations in Greene?
Greene has 1 charging station in the DOE registry with 2 ports. It is the only Red E station in Greene. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates Gowell Shop and Save Greene ME?
Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 12 of those stations are in Maine, 2% of the state's 694.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 16, 2024, one of 70 stations in Maine with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Gowell Shop and Save Greene ME have?
Gowell Shop and Save Greene ME has 2 charging ports: 2 Level 2.
Does Gowell Shop and Save Greene ME have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Gowell Shop and Save Greene ME have?
Gowell Shop and Save Greene ME has J1772 connectors.
Is Gowell Shop and Save Greene ME open to the public?
Yes. Gowell Shop and Save Greene ME is listed with public access, and its status is available.
Where is Gowell Shop and Save Greene ME?
Gowell Shop and Save Greene ME is at 440 US-202, Greene, ME 04325. Its coordinates are 44.18428, -70.16236.
More EV charging around Greene
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 351280, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gowell Shop and Save Greene ME, Greene, ME (AFDC station 351280)”, https://chargecensus.com/stations/maine/gowell-shop-and-save-greene-me-351280 (data as of October 12, 2026).