Dc Corridor Kennebunk N L2
AvailableEV charging station in Kennebunk, Maine on the ChargePoint network — 2 Level 2. US DOE AFDC station 143124.
At a glance
Dc Corridor Kennebunk N L2 is a public EV charging station at Maine Turnpike Kennebunk North Service Plaza in Kennebunk, Maine, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 15, 2019.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 143124 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 15, 2019 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
- Industrial Park Saco MB.HPC12 ports
Mercedes-Benz HPC · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Target - Tesla Supercharger8 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Dc Corridor Kennebunk N L2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Dc Corridor Kennebunk N L2 compare with other stations in Kennebunk?
Kennebunk has 18 charging stations in the DOE registry with 40 ports, the 7th-most of 136 cities and towns in Maine. Dc Corridor Kennebunk N L2 accounts for 5% of the charging ports in Kennebunk. ChargePoint runs 10 stations in Kennebunk. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates Dc Corridor Kennebunk N L2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 333 of those stations are in Maine, 48% of the state's 694.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 15, 2019, one of 21 stations in Maine with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Dc Corridor Kennebunk N L2 have?
Dc Corridor Kennebunk N L2 has 2 charging ports: 2 Level 2.
Does Dc Corridor Kennebunk N L2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Dc Corridor Kennebunk N L2 have?
Dc Corridor Kennebunk N L2 has J1772 connectors.
Is Dc Corridor Kennebunk N L2 open to the public?
Yes. Dc Corridor Kennebunk N L2 is listed with public access, and its status is available.
Where is Dc Corridor Kennebunk N L2?
Dc Corridor Kennebunk N L2 is at Maine Turnpike Kennebunk North Service Plaza, Kennebunk, ME 04043. Its coordinates are 43.40956, -70.55845.
More EV charging around Kennebunk
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 143124, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Dc Corridor Kennebunk N L2, Kennebunk, ME (AFDC station 143124)”, https://chargecensus.com/stations/maine/dc-corridor-kennebunk-n-l2-143124 (data as of October 12, 2026).