ChargeCensus

Dc Corridor Farmingtonl2

Available

EV charging station in Farmington, Maine on the ChargePoint network — 2 Level 2. US DOE AFDC station 152566.

At a glance

Dc Corridor Farmingtonl2 is a public EV charging station at 134 Hannaford Dr in Farmington, Maine, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 22, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID152566
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 22, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
134 Hannaford Dr
City
Farmington
State
Maine
ZIP
04938
Coordinates
44.65028, -70.15053

Within ~15 km

Nearby charging

What kind of charging does Dc Corridor Farmingtonl2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Dc Corridor Farmingtonl2 compare with other stations in Farmington?

Farmington has 6 charging stations in the DOE registry with 14 ports. Dc Corridor Farmingtonl2 accounts for 14% of the charging ports in Farmington. ChargePoint runs 5 stations in Farmington. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.

Who operates Dc Corridor Farmingtonl2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 333 of those stations are in Maine, 48% of the state's 694.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 22, 2020, one of 27 stations in Maine with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Dc Corridor Farmingtonl2 have?

Dc Corridor Farmingtonl2 has 2 charging ports: 2 Level 2.

Does Dc Corridor Farmingtonl2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Dc Corridor Farmingtonl2 have?

Dc Corridor Farmingtonl2 has J1772 connectors.

Is Dc Corridor Farmingtonl2 open to the public?

Yes. Dc Corridor Farmingtonl2 is listed with public access, and its status is available.

Where is Dc Corridor Farmingtonl2?

Dc Corridor Farmingtonl2 is at 134 Hannaford Dr, Farmington, ME 04938. Its coordinates are 44.65028, -70.15053.

More EV charging around Farmington

Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 152566, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Dc Corridor Farmingtonl2, Farmington, ME (AFDC station 152566)”, https://chargecensus.com/stations/maine/dc-corridor-farmingtonl2-152566 (data as of October 12, 2026).