Congregational Church in Cumberland
AvailableEV charging station in Cumberland, Maine, not on a charging network — 1 Level 2. US DOE AFDC station 79818.
At a glance
Congregational Church in Cumberland is a public EV charging station at 282 Main St in Cumberland, Maine, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 30, 2016.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 79818 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Place of worship |
| Open date | Jun 30, 2016 |
| Last updated at source | Apr 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 282 Main St
- City
- Cumberland
- State
- Maine
- ZIP
- 04021
- Coordinates
- 43.79602, -70.25904
Within ~15 km
Nearby charging
- USM Parking Garage58 ports
Blink · Available
- Dougherty Commons18 ports
Red E · Available
Tesla Supercharger · Available
- Unum12 ports
Non-networked · Available
Tesla Supercharger · Available
- Winchester Woods12 ports
AmpUp · Available
What kind of charging does Congregational Church in Cumberland offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a place of worship location.
How does Congregational Church in Cumberland compare with other stations in Cumberland?
Cumberland has 1 charging station in the DOE registry with 1 ports. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates Congregational Church in Cumberland?
Congregational Church in Cumberland is listed as non-networked: its chargers are not run through a charging-network account. Maine has 140 non-networked stations, 20% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 30, 2016, one of 26 stations in Maine with a 2016 open date. The station's record was last updated at the source on Apr 14, 2026.
Frequently asked questions
How many chargers does Congregational Church in Cumberland have?
Congregational Church in Cumberland has 1 charging port: 1 Level 2.
Does Congregational Church in Cumberland have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Congregational Church in Cumberland have?
Congregational Church in Cumberland has J1772 connectors.
Is charging at Congregational Church in Cumberland free?
Pricing as reported to the DOE registry: Free.
Is Congregational Church in Cumberland open to the public?
Yes. Congregational Church in Cumberland is listed with public access, and its status is available.
Where is Congregational Church in Cumberland?
Congregational Church in Cumberland is at 282 Main St, Cumberland, ME 04021. Its coordinates are 43.79602, -70.25904.
More EV charging around Cumberland
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 79818, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Congregational Church in Cumberland, Cumberland, ME (AFDC station 79818)”, https://chargecensus.com/stations/maine/congregational-church-in-cumberland-79818 (data as of October 12, 2026).