Cebe Deering St
AvailableEV charging station in Norway, Maine on the ChargePoint network — 2 Level 2. US DOE AFDC station 303594.
At a glance
Cebe Deering St is a public EV charging station at 16 Deering St in Norway, Maine, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 27, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 303594 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 27, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 16 Deering St
- City
- Norway
- State
- Maine
- ZIP
- 04268
- Coordinates
- 44.21390, -70.54224
Within ~15 km
Nearby charging
- Oxford Casino Hotel4 ports
Non-networked · Available
- Ohchs Station 12 ports
ChargePoint · Available
- Ohchs Station 32 ports
ChargePoint · Available
- Stephens Memorial Hospital2 ports
Non-networked · Available
Non-networked · Available
- Ohchs Station 22 ports
ChargePoint · Available
What kind of charging does Cebe Deering St offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cebe Deering St compare with other stations in Norway?
Norway has 6 charging stations in the DOE registry with 10 ports. Cebe Deering St accounts for 20% of the charging ports in Norway. ChargePoint runs 3 stations in Norway. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.
Who operates Cebe Deering St?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 333 of those stations are in Maine, 48% of the state's 694.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 27, 2023, one of 99 stations in Maine with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cebe Deering St have?
Cebe Deering St has 2 charging ports: 2 Level 2.
Does Cebe Deering St have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Cebe Deering St have?
Cebe Deering St has J1772 connectors.
Is Cebe Deering St open to the public?
Yes. Cebe Deering St is listed with public access, and its status is available.
Where is Cebe Deering St?
Cebe Deering St is at 16 Deering St, Norway, ME 04268. Its coordinates are 44.21390, -70.54224.
More EV charging around Norway
Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 303594, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cebe Deering St, Norway, ME (AFDC station 303594)”, https://chargecensus.com/stations/maine/cebe-deering-st-303594 (data as of October 12, 2026).