ChargeCensus

Acadia - Schoodic Site Fuel System

Available

EV charging station in Winter Harbor, Maine, not on a charging network — 1 Level 2. US DOE AFDC station 62685.

At a glance

Acadia - Schoodic Site Fuel System is a private EV charging station at 126 Acadia Dr in Winter Harbor, Maine, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 30, 2014.

Total ports
1
DC fast
0
Level 2
1
Access
Private
workplace charging
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID62685
NetworkNon-networked
StatusAvailable (E)
AccessPrivate
FacilityFederal government
Open dateJun 30, 2014
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
126 Acadia Dr
City
Winter Harbor
State
Maine
ZIP
04693
Coordinates
44.33713, -68.06029

Within ~15 km

Nearby charging

What kind of charging does Acadia - Schoodic Site Fuel System offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 61% below the Maine average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a federal government location. It is flagged as workplace charging.

How does Acadia - Schoodic Site Fuel System compare with other stations in Winter Harbor?

Winter Harbor has 3 charging stations in the DOE registry with 5 ports. Acadia - Schoodic Site Fuel System accounts for 20% of the charging ports in Winter Harbor. Statewide, Maine has 694 stations and 1,759 ports, the 27th-largest station count of the 51 states and DC. The biggest station in Maine, USM Parking Garage in Portland, has 58 ports.

Who operates Acadia - Schoodic Site Fuel System?

Acadia - Schoodic Site Fuel System is listed as non-networked: its chargers are not run through a charging-network account. Maine has 140 non-networked stations, 20% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Jun 30, 2014, one of 17 stations in Maine with a 2014 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Acadia - Schoodic Site Fuel System have?

Acadia - Schoodic Site Fuel System has 1 charging port: 1 Level 2.

Does Acadia - Schoodic Site Fuel System have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Acadia - Schoodic Site Fuel System have?

Acadia - Schoodic Site Fuel System has J1772 connectors.

Is Acadia - Schoodic Site Fuel System open to the public?

No. Acadia - Schoodic Site Fuel System is listed with private access.

Where is Acadia - Schoodic Site Fuel System?

Acadia - Schoodic Site Fuel System is at 126 Acadia Dr, Winter Harbor, ME 04693. Its coordinates are 44.33713, -68.06029.

More EV charging around Winter Harbor

Working with Maine charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 62685, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Acadia - Schoodic Site Fuel System, Winter Harbor, ME (AFDC station 62685)”, https://chargecensus.com/stations/maine/acadia-schoodic-site-fuel-system-62685 (data as of October 12, 2026).