Demco EV Headquarters
AvailableEV charging station in Central, Louisiana on the ChargePoint network — 2 Level 2. US DOE AFDC station 302505.
At a glance
Demco EV Headquarters is a public EV charging station at 16262 Wax Rd in Central, Louisiana, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 14, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 302505 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 14, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 16262 Wax Rd
- City
- Central
- State
- Louisiana
- ZIP
- 70739
- Coordinates
- 30.54041, -91.00998
Within ~15 km
Nearby charging
- Baton Rouge Metropolitan Airport20 ports
Red E · Available
Tesla Supercharger · Available
- Target - Tesla Supercharger8 ports
Tesla Supercharger · Available
- Baton Rouge, LA6 ports
Rivian Adventure Network · Available
Tesla Supercharger · Available
Blink · Available
What kind of charging does Demco EV Headquarters offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 38% below the Louisiana average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Demco EV Headquarters compare with other stations in Central?
Central has 1 charging station in the DOE registry with 2 ports. It is the only ChargePoint station in Central. Statewide, Louisiana has 319 stations and 1,029 ports, the 42nd-largest station count of the 51 states and DC. The biggest station in Louisiana, Lafayette, LA - Tesla Supercharger in Lafayette, has 24 ports.
Who operates Demco EV Headquarters?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 100 of those stations are in Louisiana, 31% of the state's 319.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 14, 2023, one of 63 stations in Louisiana with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Demco EV Headquarters have?
Demco EV Headquarters has 2 charging ports: 2 Level 2.
Does Demco EV Headquarters have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Demco EV Headquarters have?
Demco EV Headquarters has J1772 connectors.
Is Demco EV Headquarters open to the public?
Yes. Demco EV Headquarters is listed with public access, and its status is available.
Where is Demco EV Headquarters?
Demco EV Headquarters is at 16262 Wax Rd, Central, LA 70739. Its coordinates are 30.54041, -91.00998.
More EV charging around Central
Working with Louisiana charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 302505, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Demco EV Headquarters, Central, LA (AFDC station 302505)”, https://chargecensus.com/stations/louisiana/demco-ev-headquarters-302505 (data as of October 12, 2026).