Pikeville, Ky Pikeville 1
AvailableEV charging station in Pikeville, Kentucky on the ChargePoint network — 2 Level 2. US DOE AFDC station 191039.
At a glance
Pikeville, Ky Pikeville 1 is a public EV charging station at 805 Hambley Blvd in Pikeville, Kentucky, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 16, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 191039 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 16, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 805 Hambley Blvd
- City
- Pikeville
- State
- Kentucky
- ZIP
- 41501
- Coordinates
- 37.47792, -82.51979
Within ~15 km
Nearby charging
- Tim Short Hyundai4 ports
Blink · Available
- Walters Nissan1 ports
Non-networked · Available
What kind of charging does Pikeville, Ky Pikeville 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Kentucky average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Pikeville, Ky Pikeville 1 compare with other stations in Pikeville?
Pikeville has 3 charging stations in the DOE registry with 7 ports. Pikeville, Ky Pikeville 1 accounts for 29% of the charging ports in Pikeville. It is the only ChargePoint station in Pikeville. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.
Who operates Pikeville, Ky Pikeville 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 160 of those stations are in Kentucky, 34% of the state's 466.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 16, 2021, one of 48 stations in Kentucky with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pikeville, Ky Pikeville 1 have?
Pikeville, Ky Pikeville 1 has 2 charging ports: 2 Level 2.
Does Pikeville, Ky Pikeville 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Pikeville, Ky Pikeville 1 have?
Pikeville, Ky Pikeville 1 has J1772 connectors.
Is Pikeville, Ky Pikeville 1 open to the public?
Yes. Pikeville, Ky Pikeville 1 is listed with public access, and its status is available.
Where is Pikeville, Ky Pikeville 1?
Pikeville, Ky Pikeville 1 is at 805 Hambley Blvd, Pikeville, KY 41501. Its coordinates are 37.47792, -82.51979.
More EV charging around Pikeville
Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 191039, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pikeville, Ky Pikeville 1, Pikeville, KY (AFDC station 191039)”, https://chargecensus.com/stations/kentucky/pikeville-ky-pikeville-1-191039 (data as of October 12, 2026).