Ku High St & Mlk
AvailableEV charging station in Lexington, Kentucky on the ChargePoint network — 1 Level 2. US DOE AFDC station 81002.
At a glance
Ku High St & Mlk is a public EV charging station at 159 E High St in Lexington, Kentucky, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 26, 2017.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 81002 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 26, 2017 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- PPPO Lexington - 1017 Bldg8 ports
Non-networked · Available
- The Manchester6 ports
Dirt Road · Available
- Pinnacle Ford6 ports
Ford Charge · Available
- 2360 Chauvin Drive4 ports
Loop · Available
What kind of charging does Ku High St & Mlk offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 66% below the Kentucky average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ku High St & Mlk compare with other stations in Lexington?
Lexington has 41 charging stations in the DOE registry with 121 ports, the 2nd-most of 115 cities and towns in Kentucky. Ku High St & Mlk accounts for under 1% of the charging ports in Lexington. ChargePoint runs 19 stations in Lexington. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.
Who operates Ku High St & Mlk?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 160 of those stations are in Kentucky, 34% of the state's 466.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 26, 2017, one of 14 stations in Kentucky with a 2017 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ku High St & Mlk have?
Ku High St & Mlk has 1 charging port: 1 Level 2.
Does Ku High St & Mlk have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Ku High St & Mlk have?
Ku High St & Mlk has J1772 connectors.
Is Ku High St & Mlk open to the public?
Yes. Ku High St & Mlk is listed with public access, and its status is available.
Where is Ku High St & Mlk?
Ku High St & Mlk is at 159 E High St, Lexington, KY 40507. Its coordinates are 38.04419, -84.49761.
More EV charging around Lexington
Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 81002, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ku High St & Mlk, Lexington, KY (AFDC station 81002)”, https://chargecensus.com/stations/kentucky/ku-high-st-mlk-81002 (data as of October 12, 2026).