ChargeCensus

Highland Presbyterian Church

Available

EV charging station in Louisville, Kentucky, not on a charging network — 2 Level 2. US DOE AFDC station 221757.

At a glance

Highland Presbyterian Church is a public EV charging station at 1011 Cherokee Rd in Louisville, Kentucky, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 10, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID221757
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateJun 10, 2022
Last updated at sourceAug 11, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
1011 Cherokee Rd
ZIP
40204
Coordinates
38.24197, -85.72246

Within ~15 km

Nearby charging

What kind of charging does Highland Presbyterian Church offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Kentucky average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a parking lot location.

How does Highland Presbyterian Church compare with other stations in Louisville?

Louisville has 102 charging stations in the DOE registry with 280 ports, the most of 115 cities and towns in Kentucky. Highland Presbyterian Church accounts for under 1% of the charging ports in Louisville. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.

Who operates Highland Presbyterian Church?

Highland Presbyterian Church is listed as non-networked: its chargers are not run through a charging-network account. Kentucky has 110 non-networked stations, 24% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 10, 2022, one of 44 stations in Kentucky with a 2022 open date. The station's record was last updated at the source on Aug 11, 2026.

Frequently asked questions

How many chargers does Highland Presbyterian Church have?

Highland Presbyterian Church has 2 charging ports: 2 Level 2.

Does Highland Presbyterian Church have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Highland Presbyterian Church have?

Highland Presbyterian Church has J1772 connectors.

Is charging at Highland Presbyterian Church free?

Pricing as reported to the DOE registry: Free.

Is Highland Presbyterian Church open to the public?

Yes. Highland Presbyterian Church is listed with public access, and its status is available.

Where is Highland Presbyterian Church?

Highland Presbyterian Church is at 1011 Cherokee Rd, Louisville, KY 40204. Its coordinates are 38.24197, -85.72246.

More EV charging around Louisville

Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 221757, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Highland Presbyterian Church, Louisville, KY (AFDC station 221757)”, https://chargecensus.com/stations/kentucky/highland-presbyterian-church-221757 (data as of October 12, 2026).