Glowbrands Pf Georgetown
AvailableEV charging station in Georgetown, Kentucky on the ChargePoint network — 2 Level 2. US DOE AFDC station 227536.
At a glance
Glowbrands Pf Georgetown is a public EV charging station at 101 Fitness Path in Georgetown, Kentucky, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 14, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 227536 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 14, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 101 Fitness Path
- City
- Georgetown
- State
- Kentucky
- ZIP
- 40324
- Coordinates
- 38.23252, -84.53119
Within ~15 km
Nearby charging
- Walmart 571 (Georgetown, KY)4 ports
Electrify America · Available
- Pilot Travel Center 3534 ports
EVgo · Available
Tesla Destination · Available
- FMC Lexington2 ports
Non-networked · Available
- Obe Embassy Lexin R2 ports
ChargePoint · Available
ChargePoint · Available
What kind of charging does Glowbrands Pf Georgetown offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Kentucky average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Glowbrands Pf Georgetown compare with other stations in Georgetown?
Georgetown has 6 charging stations in the DOE registry with 15 ports, the 12th-most of 115 cities and towns in Kentucky. Glowbrands Pf Georgetown accounts for 13% of the charging ports in Georgetown. ChargePoint runs 3 stations in Georgetown. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.
Who operates Glowbrands Pf Georgetown?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 160 of those stations are in Kentucky, 34% of the state's 466.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 14, 2022, one of 44 stations in Kentucky with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Glowbrands Pf Georgetown have?
Glowbrands Pf Georgetown has 2 charging ports: 2 Level 2.
Does Glowbrands Pf Georgetown have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Glowbrands Pf Georgetown have?
Glowbrands Pf Georgetown has J1772 connectors.
Is Glowbrands Pf Georgetown open to the public?
Yes. Glowbrands Pf Georgetown is listed with public access, and its status is available.
Where is Glowbrands Pf Georgetown?
Glowbrands Pf Georgetown is at 101 Fitness Path, Georgetown, KY 40324. Its coordinates are 38.23252, -84.53119.
More EV charging around Georgetown
Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 227536, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Glowbrands Pf Georgetown, Georgetown, KY (AFDC station 227536)”, https://chargecensus.com/stations/kentucky/glowbrands-pf-georgetown-227536 (data as of October 12, 2026).