Corbin Main Campus
AvailableEV charging station in Corbin, Kentucky on the Noodoe network — 2 Level 2. US DOE AFDC station 388496.
At a glance
Corbin Main Campus is a public EV charging station at 1 Trillium Way in Corbin, Kentucky, on the Noodoe network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 24, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 388496 |
| Network | Noodoe |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 24, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1 Trillium Way
- City
- Corbin
- State
- Kentucky
- ZIP
- 40701
- Coordinates
- 36.92307, -84.11979
Within ~15 km
Nearby charging
- Baptist Corbin HR Location2 ports
Noodoe · Available
- Bhsi Site2 ports
Non-networked · Available
- Cityofcorbin Corbin 12 ports
ChargePoint · Available
- Cityofcorbin Corbin 22 ports
ChargePoint · Available
EV Connect · Available
What kind of charging does Corbin Main Campus offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Kentucky average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Corbin Main Campus compare with other stations in Corbin?
Corbin has 6 charging stations in the DOE registry with 11 ports, the 13th-most of 115 cities and towns in Kentucky. Corbin Main Campus accounts for 18% of the charging ports in Corbin. Noodoe runs 2 stations in Corbin. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.
Who operates Corbin Main Campus?
Noodoe operates 385 stations in the registry across 38 states, with 296 DC fast and 1,731 Level 2 ports in total. 10 of those stations are in Kentucky, 2% of the state's 466.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 24, 2025, one of 78 stations in Kentucky with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Corbin Main Campus have?
Corbin Main Campus has 2 charging ports: 2 Level 2.
Does Corbin Main Campus have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Corbin Main Campus have?
Corbin Main Campus has J1772 connectors.
Is Corbin Main Campus open to the public?
Yes. Corbin Main Campus is listed with public access, and its status is available.
Where is Corbin Main Campus?
Corbin Main Campus is at 1 Trillium Way, Corbin, KY 40701. Its coordinates are 36.92307, -84.11979.
More EV charging around Corbin
Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 388496, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Corbin Main Campus, Corbin, KY (AFDC station 388496)”, https://chargecensus.com/stations/kentucky/corbin-main-campus-388496 (data as of October 12, 2026).