ChargeCensus

City of Columbia

Available

EV charging station in Columbia, Kentucky on the EVmatch network — 2 Level 2. US DOE AFDC station 375164.

At a glance

City of Columbia is a public EV charging station at 170 Will Walker Rd in Columbia, Kentucky, on the EVmatch network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 26, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID375164
NetworkEVmatch
StatusAvailable (E)
AccessPublic
FacilityMunicipal government
Open dateSep 26, 2024
Last updated at sourceOct 7, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.18 per kWh

Charging network

EVmatch

Operates 63 stations in the DOE registry — view the full network →

Location

Address
170 Will Walker Rd
City
Columbia
ZIP
42728
Coordinates
37.07883, -85.33655

Within ~15 km

Nearby charging

What kind of charging does City of Columbia offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Kentucky average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.18 per kWh”. The site is listed as a municipal government location.

How does City of Columbia compare with other stations in Columbia?

Columbia has 3 charging stations in the DOE registry with 5 ports. City of Columbia accounts for 40% of the charging ports in Columbia. It is the only EVmatch station in Columbia. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.

Who operates City of Columbia?

EVmatch operates 63 stations in the registry across 12 states, with 240 Level 2 ports in total. 1 of those stations are in Kentucky, under 1% of the state's 466.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 26, 2024, one of 73 stations in Kentucky with a 2024 open date. The station's record was last updated at the source on Oct 7, 2026.

Frequently asked questions

How many chargers does City of Columbia have?

City of Columbia has 2 charging ports: 2 Level 2.

Does City of Columbia have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does City of Columbia have?

City of Columbia has J1772 connectors.

Is charging at City of Columbia free?

Pricing as reported to the DOE registry: $0.18 per kWh.

Is City of Columbia open to the public?

Yes. City of Columbia is listed with public access, and its status is available.

Where is City of Columbia?

City of Columbia is at 170 Will Walker Rd, Columbia, KY 42728. Its coordinates are 37.07883, -85.33655.

More EV charging around Columbia

Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 375164, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City of Columbia, Columbia, KY (AFDC station 375164)”, https://chargecensus.com/stations/kentucky/city-of-columbia-375164 (data as of October 12, 2026).