ChargeCensus

Cape Branch Bg Branch

Available

EV charging station in Bowling Green, Kentucky on the ChargePoint network — 2 Level 2. US DOE AFDC station 205923.

At a glance

Cape Branch Bg Branch is a public EV charging station at 140 Flex Park Ln in Bowling Green, Kentucky, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 5, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID205923
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 5, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
140 Flex Park Ln
ZIP
42101
Coordinates
36.92809, -86.50010

Within ~15 km

Nearby charging

What kind of charging does Cape Branch Bg Branch offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Kentucky average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Cape Branch Bg Branch compare with other stations in Bowling Green?

Bowling Green has 29 charging stations in the DOE registry with 75 ports, the 3rd-most of 115 cities and towns in Kentucky. Cape Branch Bg Branch accounts for 3% of the charging ports in Bowling Green. ChargePoint runs 10 stations in Bowling Green. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.

Who operates Cape Branch Bg Branch?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 160 of those stations are in Kentucky, 34% of the state's 466.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 5, 2022, one of 44 stations in Kentucky with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Cape Branch Bg Branch have?

Cape Branch Bg Branch has 2 charging ports: 2 Level 2.

Does Cape Branch Bg Branch have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Cape Branch Bg Branch have?

Cape Branch Bg Branch has J1772 connectors.

Is Cape Branch Bg Branch open to the public?

Yes. Cape Branch Bg Branch is listed with public access, and its status is available.

Where is Cape Branch Bg Branch?

Cape Branch Bg Branch is at 140 Flex Park Ln, Bowling Green, KY 42101. Its coordinates are 36.92809, -86.50010.

More EV charging around Bowling Green

Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 205923, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Cape Branch Bg Branch, Bowling Green, KY (AFDC station 205923)”, https://chargecensus.com/stations/kentucky/cape-branch-bg-branch-205923 (data as of October 12, 2026).