Berea Municipal Utilities
AvailableEV charging station in Berea, Kentucky, not on a charging network — 4 Level 2. US DOE AFDC station 197746.
At a glance
Berea Municipal Utilities is a public EV charging station at 200 Harrison Rd in Berea, Kentucky, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 12, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 197746 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Municipal government |
| Open date | Oct 12, 2021 |
| Last updated at source | Aug 11, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 200 Harrison Rd
- City
- Berea
- State
- Kentucky
- ZIP
- 40503
- Coordinates
- 37.57425, -84.27636
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Berea City Hall8 ports
Non-networked · Available
- CircleK - Berea, KY4 ports
Circle K Charge · Available
Non-networked · Available
- Docjt Cash Bldg #12 ports
ChargePoint · Available
- Docjt Cash Bldg #22 ports
ChargePoint · Available
What kind of charging does Berea Municipal Utilities offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 34% above the Kentucky average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a municipal government location.
How does Berea Municipal Utilities compare with other stations in Berea?
Berea has 5 charging stations in the DOE registry with 19 ports, the 21st-most of 115 cities and towns in Kentucky. Berea Municipal Utilities accounts for 21% of the charging ports in Berea. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.
Who operates Berea Municipal Utilities?
Berea Municipal Utilities is listed as non-networked: its chargers are not run through a charging-network account. Kentucky has 110 non-networked stations, 24% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 12, 2021, one of 48 stations in Kentucky with a 2021 open date. The station's record was last updated at the source on Aug 11, 2026.
Frequently asked questions
How many chargers does Berea Municipal Utilities have?
Berea Municipal Utilities has 4 charging ports: 4 Level 2.
Does Berea Municipal Utilities have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does Berea Municipal Utilities have?
Berea Municipal Utilities has J1772 connectors.
Is charging at Berea Municipal Utilities free?
Pricing as reported to the DOE registry: Free.
Is Berea Municipal Utilities open to the public?
Yes. Berea Municipal Utilities is listed with public access, and its status is available.
Where is Berea Municipal Utilities?
Berea Municipal Utilities is at 200 Harrison Rd, Berea, KY 40503. Its coordinates are 37.57425, -84.27636.
More EV charging around Berea
Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 197746, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Berea Municipal Utilities, Berea, KY (AFDC station 197746)”, https://chargecensus.com/stations/kentucky/berea-municipal-utilities-197746 (data as of October 12, 2026).