Beaver Dam, KY - Tesla Supercharger
AvailableEV charging station in Beaver Dam, Kentucky on the Tesla Supercharger network — 8 DC fast. US DOE AFDC station 198004.
At a glance
Beaver Dam, KY - Tesla Supercharger is a public EV charging station at 675 Western Kentucky Parkway in Beaver Dam, Kentucky, on the Tesla Supercharger network. It has 8 charging ports (8 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Oct 19, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 198004 |
| Network | Tesla Supercharger |
| Status | Available (E) |
| Access | Public |
| Facility | Restaurant |
| Open date | Oct 19, 2021 |
| Last updated at source | Jun 18, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Charging network
Operates 3,280 stations in the DOE registry — view the full network →
Location
- Address
- 675 Western Kentucky Parkway
- City
- Beaver Dam
- State
- Kentucky
- ZIP
- 42320
- Coordinates
- 37.37727, -86.82608
Within ~15 km
Nearby charging
- Wrecc Station 11 ports
ChargePoint · Available
- Wrecc Station 21 ports
ChargePoint · Available
What kind of charging does Beaver Dam, KY - Tesla Supercharger offer?
Of its 8 ports, 8 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 2.7 times the Kentucky average of 3 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector. The site is listed as a restaurant location.
How does Beaver Dam, KY - Tesla Supercharger compare with other stations in Beaver Dam?
Beaver Dam has 3 charging stations in the DOE registry with 10 ports. Beaver Dam, KY - Tesla Supercharger accounts for 80% of the charging ports in Beaver Dam. It is the only Tesla Supercharger station in Beaver Dam. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.
Who operates Beaver Dam, KY - Tesla Supercharger?
Tesla's DC fast-charging network — the largest DC fast footprint in the US, increasingly open to non-Tesla EVs via NACS. Tesla Supercharger operates 3,280 stations in the registry across 51 states, with 40,183 DC fast ports in total. 21 of those stations are in Kentucky, 5% of the state's 466.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 19, 2021, one of 48 stations in Kentucky with a 2021 open date. The station's record was last updated at the source on Jun 18, 2026.
Frequently asked questions
How many chargers does Beaver Dam, KY - Tesla Supercharger have?
Beaver Dam, KY - Tesla Supercharger has 8 charging ports: 8 DC fast.
Does Beaver Dam, KY - Tesla Supercharger have DC fast charging?
Yes. The registry lists 8 DC fast ports at Beaver Dam, KY - Tesla Supercharger, with CCS and NACS (Tesla) connectors.
What connectors does Beaver Dam, KY - Tesla Supercharger have?
Beaver Dam, KY - Tesla Supercharger has CCS and NACS (Tesla) connectors.
Is Beaver Dam, KY - Tesla Supercharger open to the public?
Yes. Beaver Dam, KY - Tesla Supercharger is listed with public access, and its status is available.
Where is Beaver Dam, KY - Tesla Supercharger?
Beaver Dam, KY - Tesla Supercharger is at 675 Western Kentucky Parkway, Beaver Dam, KY 42320. Its coordinates are 37.37727, -86.82608.
More EV charging around Beaver Dam
Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 198004, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Beaver Dam, KY - Tesla Supercharger, Beaver Dam, KY (AFDC station 198004)”, https://chargecensus.com/stations/kentucky/beaver-dam-ky-tesla-supercharger-198004 (data as of October 12, 2026).