Barbourville City Hall
AvailableEV charging station in Barbourville, Kentucky on the ChargePoint network — 1 DC fast. US DOE AFDC station 429960.
At a glance
Barbourville City Hall is a public EV charging station at 196 Daniel Boone Dr in Barbourville, Kentucky, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Oct 16, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 429960 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 16, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 196 Daniel Boone Dr
- City
- Barbourville
- State
- Kentucky
- ZIP
- 40906
- Coordinates
- 36.86549, -83.88736
Within ~15 km
Nearby charging
- Barbourville Tourism2 ports
ChargePoint · Available
What kind of charging does Barbourville City Hall offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 66% below the Kentucky average of 3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Barbourville City Hall compare with other stations in Barbourville?
Barbourville has 2 charging stations in the DOE registry with 3 ports. Barbourville City Hall accounts for 33% of the charging ports in Barbourville. ChargePoint runs 2 stations in Barbourville. Statewide, Kentucky has 466 stations and 1,390 ports, the 34th-largest station count of the 51 states and DC. The biggest station in Kentucky, Fort Campbell in Fort Campbell, has 32 ports.
Who operates Barbourville City Hall?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 160 of those stations are in Kentucky, 34% of the state's 466.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 16, 2025, one of 78 stations in Kentucky with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Barbourville City Hall have?
Barbourville City Hall has 1 charging port: 1 DC fast.
Does Barbourville City Hall have DC fast charging?
Yes. The registry lists 1 DC fast port at Barbourville City Hall, with CHAdeMO and CCS connectors.
What connectors does Barbourville City Hall have?
Barbourville City Hall has CHAdeMO and CCS connectors.
Is Barbourville City Hall open to the public?
Yes. Barbourville City Hall is listed with public access, and its status is available.
Where is Barbourville City Hall?
Barbourville City Hall is at 196 Daniel Boone Dr, Barbourville, KY 40906. Its coordinates are 36.86549, -83.88736.
More EV charging around Barbourville
Working with Kentucky charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 429960, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Barbourville City Hall, Barbourville, KY (AFDC station 429960)”, https://chargecensus.com/stations/kentucky/barbourville-city-hall-429960 (data as of October 12, 2026).