ChargeCensus

Weci Harper

Available

EV charging station in Harper, Kansas on the ChargePoint network — 2 Level 2. US DOE AFDC station 326384.

At a glance

Weci Harper is a public EV charging station at 906 Central St in Harper, Kansas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 24, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
Location

Station record

DOE registry record

FieldValue
AFDC station ID326384
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 24, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
906 Central St
City
Harper
State
Kansas
ZIP
67058
Coordinates
37.28751, -98.02630

Within ~15 km

Nearby charging

No other registered stations within ~15 km.

What kind of charging does Weci Harper offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Kansas average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Weci Harper compare with other stations in Harper?

Harper has 1 charging station in the DOE registry with 2 ports. It is the only ChargePoint station in Harper. Statewide, Kansas has 627 stations and 1,650 ports, the 30th-largest station count of the 51 states and DC. The biggest station in Kansas, Topeka Ks Sdc in Topeka, has 95 ports.

Who operates Weci Harper?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 413 of those stations are in Kansas, 66% of the state's 627.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 24, 2024, one of 75 stations in Kansas with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Weci Harper have?

Weci Harper has 2 charging ports: 2 Level 2.

Does Weci Harper have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Weci Harper have?

Weci Harper has J1772 connectors.

Is Weci Harper open to the public?

Yes. Weci Harper is listed with public access, and its status is available.

Where is Weci Harper?

Weci Harper is at 906 Central St, Harper, KS 67058. Its coordinates are 37.28751, -98.02630.

More EV charging around Harper

Working with Kansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 326384, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Weci Harper, Harper, KS (AFDC station 326384)”, https://chargecensus.com/stations/kansas/weci-harper-326384 (data as of October 12, 2026).