ChargeCensus

Waterfront Station 2

Available

EV charging station in Wichita, Kansas on the ChargePoint network — 2 Level 2. US DOE AFDC station 226876.

At a glance

Waterfront Station 2 is a public EV charging station at 1550 Waterfront in Wichita, Kansas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 2, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID226876
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 2, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1550 Waterfront
State
Kansas
ZIP
67206
Coordinates
37.71099, -97.22141

Within ~15 km

Nearby charging

What kind of charging does Waterfront Station 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Kansas average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Waterfront Station 2 compare with other stations in Wichita?

Wichita has 54 charging stations in the DOE registry with 121 ports, the 2nd-most of 92 cities and towns in Kansas. Waterfront Station 2 accounts for 2% of the charging ports in Wichita. ChargePoint runs 34 stations in Wichita. Statewide, Kansas has 627 stations and 1,650 ports, the 30th-largest station count of the 51 states and DC. The biggest station in Kansas, Topeka Ks Sdc in Topeka, has 95 ports.

Who operates Waterfront Station 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 413 of those stations are in Kansas, 66% of the state's 627.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 2, 2022, one of 35 stations in Kansas with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Waterfront Station 2 have?

Waterfront Station 2 has 2 charging ports: 2 Level 2.

Does Waterfront Station 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Waterfront Station 2 have?

Waterfront Station 2 has J1772 connectors.

Is Waterfront Station 2 open to the public?

Yes. Waterfront Station 2 is listed with public access, and its status is available.

Where is Waterfront Station 2?

Waterfront Station 2 is at 1550 Waterfront, Wichita, KS 67206. Its coordinates are 37.71099, -97.22141.

More EV charging around Wichita

Working with Kansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 226876, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Waterfront Station 2, Wichita, KS (AFDC station 226876)”, https://chargecensus.com/stations/kansas/waterfront-station-2-226876 (data as of October 12, 2026).