ChargeCensus

Herington EV 1

Available

EV charging station in Herington, Kansas on the ChargePoint network — 2 Level 2. US DOE AFDC station 319749.

At a glance

Herington EV 1 is a public EV charging station at 555 US-77 in Herington, Kansas, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 15, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
Location

Station record

DOE registry record

FieldValue
AFDC station ID319749
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 15, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
555 US-77
City
Herington
State
Kansas
ZIP
67449
Coordinates
38.67615, -96.93108

Within ~15 km

Nearby charging

No other registered stations within ~15 km.

What kind of charging does Herington EV 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Kansas average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Herington EV 1 compare with other stations in Herington?

Herington has 1 charging station in the DOE registry with 2 ports. It is the only ChargePoint station in Herington. Statewide, Kansas has 627 stations and 1,650 ports, the 30th-largest station count of the 51 states and DC. The biggest station in Kansas, Topeka Ks Sdc in Topeka, has 95 ports.

Who operates Herington EV 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 413 of those stations are in Kansas, 66% of the state's 627.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 15, 2023, one of 74 stations in Kansas with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Herington EV 1 have?

Herington EV 1 has 2 charging ports: 2 Level 2.

Does Herington EV 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Herington EV 1 have?

Herington EV 1 has J1772 connectors.

Is Herington EV 1 open to the public?

Yes. Herington EV 1 is listed with public access, and its status is available.

Where is Herington EV 1?

Herington EV 1 is at 555 US-77, Herington, KS 67449. Its coordinates are 38.67615, -96.93108.

More EV charging around Herington

Working with Kansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 319749, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Herington EV 1, Herington, KS (AFDC station 319749)”, https://chargecensus.com/stations/kansas/herington-ev-1-319749 (data as of October 12, 2026).