Clock Tower Landing
AvailableEV charging station in Overland Park, Kansas on the Blink network — 8 Level 2. US DOE AFDC station 461155.
At a glance
Clock Tower Landing is a public EV charging station at 7950 Marty Street in Overland Park, Kansas, on the Blink network. It has 8 charging ports (8 Level 2) with J1772 and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Jun 16, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 461155 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 16, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 7950 Marty Street
- City
- Overland Park
- State
- Kansas
- ZIP
- 66204
- Coordinates
- 38.98488, -94.67070
Within ~15 km
Nearby charging
- Mission, KS - Tesla Supercharger20 ports
Tesla Supercharger · Available
- century towers kcfd12 ports
AmpUp · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Lenexa, KS - Tesla Supercharger12 ports
Tesla Supercharger · Available
- HealthPeak10 ports
Noodoe · Available
What kind of charging does Clock Tower Landing offer?
Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3 times the Kansas average of 2.6 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; NACS (Tesla), the North American Charging Standard connector.
How does Clock Tower Landing compare with other stations in Overland Park?
Overland Park has 144 charging stations in the DOE registry with 329 ports, the most of 92 cities and towns in Kansas. Clock Tower Landing accounts for 2% of the charging ports in Overland Park. Blink runs 16 stations in Overland Park. Statewide, Kansas has 627 stations and 1,650 ports, the 30th-largest station count of the 51 states and DC. The biggest station in Kansas, Topeka Ks Sdc in Topeka, has 95 ports.
Who operates Clock Tower Landing?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 38 of those stations are in Kansas, 6% of the state's 627.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 16, 2026, one of 42 stations in Kansas with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Clock Tower Landing have?
Clock Tower Landing has 8 charging ports: 8 Level 2.
Does Clock Tower Landing have DC fast charging?
No. The registry lists no DC fast ports here; its 8 ports are all Level 2.
What connectors does Clock Tower Landing have?
Clock Tower Landing has J1772 and NACS (Tesla) connectors.
Is Clock Tower Landing open to the public?
Yes. Clock Tower Landing is listed with public access, and its status is available.
Where is Clock Tower Landing?
Clock Tower Landing is at 7950 Marty Street, Overland Park, KS 66204. Its coordinates are 38.98488, -94.67070.
More EV charging around Overland Park
Working with Kansas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 461155, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Clock Tower Landing, Overland Park, KS (AFDC station 461155)”, https://chargecensus.com/stations/kansas/clock-tower-landing-461155 (data as of October 12, 2026).