Tri-City Electric
AvailableEV charging station in Davenport, Iowa, not on a charging network — 1 Level 2. US DOE AFDC station 46790.
At a glance
Tri-City Electric is a public EV charging station at 6225 N Brady St in Davenport, Iowa, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 2, 2011.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 46790 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Office building |
| Open date | Jun 2, 2011 |
| Last updated at source | May 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Rock Island Arsenal8 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Destination · Available
Tesla Destination · Available
What kind of charging does Tri-City Electric offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a office building location.
How does Tri-City Electric compare with other stations in Davenport?
Davenport has 18 charging stations in the DOE registry with 48 ports, the 5th-most of 131 cities and towns in Iowa. Tri-City Electric accounts for 2% of the charging ports in Davenport. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.
Who operates Tri-City Electric?
Tri-City Electric is listed as non-networked: its chargers are not run through a charging-network account. Iowa has 50 non-networked stations, 9% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 2, 2011, one of 8 stations in Iowa with a 2011 open date. The station's record was last updated at the source on May 12, 2026.
Frequently asked questions
How many chargers does Tri-City Electric have?
Tri-City Electric has 1 charging port: 1 Level 2.
Does Tri-City Electric have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Tri-City Electric have?
Tri-City Electric has J1772 connectors.
Is Tri-City Electric open to the public?
Yes. Tri-City Electric is listed with public access, and its status is available.
Where is Tri-City Electric?
Tri-City Electric is at 6225 N Brady St, Davenport, IA 52806. Its coordinates are 41.58292, -90.57135.
More EV charging around Davenport
Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 46790, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Tri-City Electric, Davenport, IA (AFDC station 46790)”, https://chargecensus.com/stations/iowa/tri-city-electric-46790 (data as of October 12, 2026).