Park Cr 1
AvailableEV charging station in Cedar Rapids, Iowa on the ChargePoint network — 1 Level 2. US DOE AFDC station 450587.
At a glance
Park Cr 1 is a public EV charging station at 175 3rd Street Southwest in Cedar Rapids, Iowa, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 3, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 450587 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 3, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 175 3rd Street Southwest
- City
- Cedar Rapids
- State
- Iowa
- ZIP
- 52404
- Coordinates
- 41.97521, -91.67457
Within ~15 km
Nearby charging
Non-networked · Available
Tesla Supercharger · Available
Blink · Available
Non-networked · Available
Turnongreen · Available
- McGrath Auto4 ports
Blink · Available
What kind of charging does Park Cr 1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Park Cr 1 compare with other stations in Cedar Rapids?
Cedar Rapids has 28 charging stations in the DOE registry with 70 ports, the 3rd-most of 131 cities and towns in Iowa. Park Cr 1 accounts for 1% of the charging ports in Cedar Rapids. ChargePoint runs 15 stations in Cedar Rapids. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.
Who operates Park Cr 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Iowa, 48% of the state's 528.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 3, 2026, one of 53 stations in Iowa with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Park Cr 1 have?
Park Cr 1 has 1 charging port: 1 Level 2.
Does Park Cr 1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Park Cr 1 have?
Park Cr 1 has J1772 connectors.
Is Park Cr 1 open to the public?
Yes. Park Cr 1 is listed with public access, and its status is available.
Where is Park Cr 1?
Park Cr 1 is at 175 3rd Street Southwest, Cedar Rapids, IA 52404. Its coordinates are 41.97521, -91.67457.
More EV charging around Cedar Rapids
Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 450587, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Park Cr 1, Cedar Rapids, IA (AFDC station 450587)”, https://chargecensus.com/stations/iowa/park-cr-1-450587 (data as of October 12, 2026).