Muscatine Power and Water
AvailableEV charging station in Muscatine, Iowa on the EV Connect network — 2 Level 2. US DOE AFDC station 168463.
At a glance
Muscatine Power and Water is a public EV charging station at 3205 Cedar Street in Muscatine, Iowa, on the EV Connect network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 16, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 168463 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 16, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
EV Connect · Available
- HNI Corporation4 ports
EV Connect · Available
- HNI Corp4 ports
EV Connect · Available
- HNI Corp4 ports
EV Connect · Available
- 500 S Houser St2 ports
EV Connect · Available
- Oak Street2 ports
EV Connect · Available
What kind of charging does Muscatine Power and Water offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Muscatine Power and Water compare with other stations in Muscatine?
Muscatine has 10 charging stations in the DOE registry with 28 ports, the 14th-most of 131 cities and towns in Iowa. Muscatine Power and Water accounts for 7% of the charging ports in Muscatine. EV Connect runs 10 stations in Muscatine. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.
Who operates Muscatine Power and Water?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 23 of those stations are in Iowa, 4% of the state's 528.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 16, 2020, one of 37 stations in Iowa with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Muscatine Power and Water have?
Muscatine Power and Water has 2 charging ports: 2 Level 2.
Does Muscatine Power and Water have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Muscatine Power and Water have?
Muscatine Power and Water has J1772 connectors.
Is Muscatine Power and Water open to the public?
Yes. Muscatine Power and Water is listed with public access, and its status is available.
Where is Muscatine Power and Water?
Muscatine Power and Water is at 3205 Cedar Street, Muscatine, IA 52761. Its coordinates are 41.43651, -91.08233.
More EV charging around Muscatine
Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 168463, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Muscatine Power and Water, Muscatine, IA (AFDC station 168463)”, https://chargecensus.com/stations/iowa/muscatine-power-and-water-168463 (data as of October 12, 2026).