ChargeCensus

Mlk Park Ramp Level 2

Available

EV charging station in Sioux City, Iowa on the ChargePoint network — 2 Level 2. US DOE AFDC station 447853.

At a glance

Mlk Park Ramp Level 2 is a public EV charging station at 525 6th Street in Sioux City, Iowa, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Dec 17, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID447853
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 17, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
525 6th Street
State
Iowa
ZIP
51101
Coordinates
42.49617, -96.40369

Within ~15 km

Nearby charging

What kind of charging does Mlk Park Ramp Level 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; NACS (Tesla), the North American Charging Standard connector.

How does Mlk Park Ramp Level 2 compare with other stations in Sioux City?

Sioux City has 12 charging stations in the DOE registry with 38 ports, the 10th-most of 131 cities and towns in Iowa. Mlk Park Ramp Level 2 accounts for 5% of the charging ports in Sioux City. ChargePoint runs 6 stations in Sioux City. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.

Who operates Mlk Park Ramp Level 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Iowa, 48% of the state's 528.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 17, 2025, one of 61 stations in Iowa with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Mlk Park Ramp Level 2 have?

Mlk Park Ramp Level 2 has 2 charging ports: 2 Level 2.

Does Mlk Park Ramp Level 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Mlk Park Ramp Level 2 have?

Mlk Park Ramp Level 2 has J1772 and NACS (Tesla) connectors.

Is Mlk Park Ramp Level 2 open to the public?

Yes. Mlk Park Ramp Level 2 is listed with public access, and its status is available.

Where is Mlk Park Ramp Level 2?

Mlk Park Ramp Level 2 is at 525 6th Street, Sioux City, IA 51101. Its coordinates are 42.49617, -96.40369.

More EV charging around Sioux City

Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 447853, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Mlk Park Ramp Level 2, Sioux City, IA (AFDC station 447853)”, https://chargecensus.com/stations/iowa/mlk-park-ramp-level-2-447853 (data as of October 12, 2026).