Lindquistford Block 1
AvailableEV charging station in Bettendorf, Iowa on the ChargePoint network — 2 Level 2. US DOE AFDC station 331022.
At a glance
Lindquistford Block 1 is a public EV charging station at 3950 Middle Rd in Bettendorf, Iowa, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 22, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 331022 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 22, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 3950 Middle Rd
- City
- Bettendorf
- State
- Iowa
- ZIP
- 52722
- Coordinates
- 41.55580, -90.47677
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Rock Island Arsenal8 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Destination · Available
Tesla Destination · Available
What kind of charging does Lindquistford Block 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Lindquistford Block 1 compare with other stations in Bettendorf?
Bettendorf has 11 charging stations in the DOE registry with 38 ports, the 12th-most of 131 cities and towns in Iowa. Lindquistford Block 1 accounts for 5% of the charging ports in Bettendorf. ChargePoint runs 6 stations in Bettendorf. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.
Who operates Lindquistford Block 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Iowa, 48% of the state's 528.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 22, 2024, one of 97 stations in Iowa with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Lindquistford Block 1 have?
Lindquistford Block 1 has 2 charging ports: 2 Level 2.
Does Lindquistford Block 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Lindquistford Block 1 have?
Lindquistford Block 1 has J1772 connectors.
Is Lindquistford Block 1 open to the public?
Yes. Lindquistford Block 1 is listed with public access, and its status is available.
Where is Lindquistford Block 1?
Lindquistford Block 1 is at 3950 Middle Rd, Bettendorf, IA 52722. Its coordinates are 41.55580, -90.47677.
More EV charging around Bettendorf
Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 331022, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Lindquistford Block 1, Bettendorf, IA (AFDC station 331022)”, https://chargecensus.com/stations/iowa/lindquistford-block-1-331022 (data as of October 12, 2026).