ChargeCensus

L195 Lvl 3 Expp 1

Available

EV charging station in Johnston, Iowa on the ChargePoint network — 2 DC fast. US DOE AFDC station 397107.

At a glance

L195 Lvl 3 Expp 1 is a public EV charging station at 5138 Merle Hay Road in Johnston, Iowa, on the ChargePoint network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since May 29, 2025.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID397107
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 29, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5138 Merle Hay Road
City
Johnston
State
Iowa
ZIP
50131
Coordinates
41.65391, -93.69841

Within ~15 km

Nearby charging

What kind of charging does L195 Lvl 3 Expp 1 offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does L195 Lvl 3 Expp 1 compare with other stations in Johnston?

Johnston has 6 charging stations in the DOE registry with 11 ports, the 22nd-most of 131 cities and towns in Iowa. L195 Lvl 3 Expp 1 accounts for 18% of the charging ports in Johnston. ChargePoint runs 2 stations in Johnston. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.

Who operates L195 Lvl 3 Expp 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Iowa, 48% of the state's 528.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 29, 2025, one of 61 stations in Iowa with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does L195 Lvl 3 Expp 1 have?

L195 Lvl 3 Expp 1 has 2 charging ports: 2 DC fast.

Does L195 Lvl 3 Expp 1 have DC fast charging?

Yes. The registry lists 2 DC fast ports at L195 Lvl 3 Expp 1, with CCS connectors.

What connectors does L195 Lvl 3 Expp 1 have?

L195 Lvl 3 Expp 1 has CCS connectors.

Is L195 Lvl 3 Expp 1 open to the public?

Yes. L195 Lvl 3 Expp 1 is listed with public access, and its status is available.

Where is L195 Lvl 3 Expp 1?

L195 Lvl 3 Expp 1 is at 5138 Merle Hay Road, Johnston, IA 50131. Its coordinates are 41.65391, -93.69841.

More EV charging around Johnston

Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 397107, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “L195 Lvl 3 Expp 1, Johnston, IA (AFDC station 397107)”, https://chargecensus.com/stations/iowa/l195-lvl-3-expp-1-397107 (data as of October 12, 2026).