Irl West Ramp Quarry Rd L1 #1
AvailableEV charging station in Coralville, Iowa on the ChargePoint network — 1 Level 2. US DOE AFDC station 68800.
At a glance
Irl West Ramp Quarry Rd L1 #1 is a public EV charging station at 906 Quarry Rd in Coralville, Iowa, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 5, 2015.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 68800 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 5, 2015 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 906 Quarry Rd
- City
- Coralville
- State
- Iowa
- ZIP
- 52241
- Coordinates
- 41.68253, -91.56029
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Junge Ford - Dcfc6 ports
Blink · Available
- JUNGE FORD - Series6 ports
Blink · Available
Synergev · Available
- City of Coralville4 ports
Turnongreen · Temporarily unavailable
What kind of charging does Irl West Ramp Quarry Rd L1 #1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Irl West Ramp Quarry Rd L1 #1 compare with other stations in Coralville?
Coralville has 13 charging stations in the DOE registry with 28 ports, the 9th-most of 131 cities and towns in Iowa. Irl West Ramp Quarry Rd L1 #1 accounts for 4% of the charging ports in Coralville. ChargePoint runs 9 stations in Coralville. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.
Who operates Irl West Ramp Quarry Rd L1 #1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Iowa, 48% of the state's 528.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 5, 2015, one of 5 stations in Iowa with a 2015 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Irl West Ramp Quarry Rd L1 #1 have?
Irl West Ramp Quarry Rd L1 #1 has 1 charging port: 1 Level 2.
Does Irl West Ramp Quarry Rd L1 #1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Irl West Ramp Quarry Rd L1 #1 have?
Irl West Ramp Quarry Rd L1 #1 has J1772 connectors.
Is Irl West Ramp Quarry Rd L1 #1 open to the public?
Yes. Irl West Ramp Quarry Rd L1 #1 is listed with public access, and its status is available.
Where is Irl West Ramp Quarry Rd L1 #1?
Irl West Ramp Quarry Rd L1 #1 is at 906 Quarry Rd, Coralville, IA 52241. Its coordinates are 41.68253, -91.56029.
More EV charging around Coralville
Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 68800, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Irl West Ramp Quarry Rd L1 #1, Coralville, IA (AFDC station 68800)”, https://chargecensus.com/stations/iowa/irl-west-ramp-quarry-rd-l1-1-68800 (data as of October 12, 2026).