ChargeCensus

Fort Dodge CDJR

Available

EV charging station in Fort Dodge, Iowa on the Blink network — 2 DC fast. US DOE AFDC station 459523.

At a glance

Fort Dodge CDJR is a public EV charging station at 3126 5th Avenue South in Fort Dodge, Iowa, on the Blink network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Feb 13, 2026.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 4 nearby

Station record

DOE registry record

FieldValue
AFDC station ID459523
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateFeb 13, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
3126 5th Avenue South
City
Fort Dodge
State
Iowa
ZIP
50501
Coordinates
42.50259, -94.15036

Within ~15 km

Nearby charging

What kind of charging does Fort Dodge CDJR offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Fort Dodge CDJR compare with other stations in Fort Dodge?

Fort Dodge has 5 charging stations in the DOE registry with 20 ports, the 24th-most of 131 cities and towns in Iowa. Fort Dodge CDJR accounts for 10% of the charging ports in Fort Dodge. It is the only Blink station in Fort Dodge. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.

Who operates Fort Dodge CDJR?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 55 of those stations are in Iowa, 10% of the state's 528.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 13, 2026, one of 53 stations in Iowa with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Fort Dodge CDJR have?

Fort Dodge CDJR has 2 charging ports: 2 DC fast.

Does Fort Dodge CDJR have DC fast charging?

Yes. The registry lists 2 DC fast ports at Fort Dodge CDJR, with CCS connectors.

What connectors does Fort Dodge CDJR have?

Fort Dodge CDJR has CCS connectors.

Is Fort Dodge CDJR open to the public?

Yes. Fort Dodge CDJR is listed with public access, and its status is available.

Where is Fort Dodge CDJR?

Fort Dodge CDJR is at 3126 5th Avenue South, Fort Dodge, IA 50501. Its coordinates are 42.50259, -94.15036.

More EV charging around Fort Dodge

Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 459523, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Fort Dodge CDJR, Fort Dodge, IA (AFDC station 459523)”, https://chargecensus.com/stations/iowa/fort-dodge-cdjr-459523 (data as of October 12, 2026).