Fbsiculus Pemb #3
AvailableEV charging station in Altoona, Iowa on the ChargePoint network — 2 Level 2. US DOE AFDC station 357838.
At a glance
Fbsiculus Pemb #3 is a public EV charging station at 5501 NE 62nd Ave in Altoona, Iowa, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 11, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 357838 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 11, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Lauridsen Skatepark6 ports
Blink · Available
- Pleasant Hill Hy-Vee4 ports
ChargeLab · Available
- 2930 SE 14th St4 ports
ChargeLab · Available
- 4605 Fleur Dr4 ports
ChargeLab · Available
What kind of charging does Fbsiculus Pemb #3 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Fbsiculus Pemb #3 compare with other stations in Altoona?
Altoona has 17 charging stations in the DOE registry with 43 ports, the 6th-most of 131 cities and towns in Iowa. Fbsiculus Pemb #3 accounts for 5% of the charging ports in Altoona. ChargePoint runs 13 stations in Altoona. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.
Who operates Fbsiculus Pemb #3?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Iowa, 48% of the state's 528.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 11, 2024, one of 97 stations in Iowa with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Fbsiculus Pemb #3 have?
Fbsiculus Pemb #3 has 2 charging ports: 2 Level 2.
Does Fbsiculus Pemb #3 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Fbsiculus Pemb #3 have?
Fbsiculus Pemb #3 has J1772 connectors.
Is Fbsiculus Pemb #3 open to the public?
Yes. Fbsiculus Pemb #3 is listed with public access, and its status is available.
Where is Fbsiculus Pemb #3?
Fbsiculus Pemb #3 is at 5501 NE 62nd Ave, Altoona, IA 50009. Its coordinates are 41.67286, -93.50470.
More EV charging around Altoona
Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 357838, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Fbsiculus Pemb #3, Altoona, IA (AFDC station 357838)”, https://chargecensus.com/stations/iowa/fbsiculus-pemb-3-357838 (data as of October 12, 2026).