ChargeCensus

Eastern Iowa Light and Power - Wapello Office

Available

EV charging station in Wapello, Iowa on the ZEF Energy network — 2 Level 2. US DOE AFDC station 307845.

At a glance

Eastern Iowa Light and Power - Wapello Office is a public EV charging station at 101 Surrey Drive in Wapello, Iowa, on the ZEF Energy network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 24, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
Location

Station record

DOE registry record

FieldValue
AFDC station ID307845
NetworkZEF Energy
StatusAvailable (E)
AccessPublic
Open dateAug 24, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ZEF Energy

Operates 297 stations in the DOE registry — view the full network →

Location

Address
101 Surrey Drive
City
Wapello
State
Iowa
ZIP
52653
Coordinates
41.17521, -91.19160

Within ~15 km

Nearby charging

No other registered stations within ~15 km.

What kind of charging does Eastern Iowa Light and Power - Wapello Office offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Eastern Iowa Light and Power - Wapello Office compare with other stations in Wapello?

Wapello has 1 charging station in the DOE registry with 2 ports. It is the only ZEF Energy station in Wapello. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.

Who operates Eastern Iowa Light and Power - Wapello Office?

ZEF Energy operates 297 stations in the registry across 24 states, with 208 DC fast and 600 Level 2 ports in total. 6 of those stations are in Iowa, 1% of the state's 528.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 24, 2023, one of 72 stations in Iowa with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Eastern Iowa Light and Power - Wapello Office have?

Eastern Iowa Light and Power - Wapello Office has 2 charging ports: 2 Level 2.

Does Eastern Iowa Light and Power - Wapello Office have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Eastern Iowa Light and Power - Wapello Office have?

Eastern Iowa Light and Power - Wapello Office has J1772 connectors.

Is Eastern Iowa Light and Power - Wapello Office open to the public?

Yes. Eastern Iowa Light and Power - Wapello Office is listed with public access, and its status is available.

Where is Eastern Iowa Light and Power - Wapello Office?

Eastern Iowa Light and Power - Wapello Office is at 101 Surrey Drive, Wapello, IA 52653. Its coordinates are 41.17521, -91.19160.

More EV charging around Wapello

Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 307845, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Eastern Iowa Light and Power - Wapello Office, Wapello, IA (AFDC station 307845)”, https://chargecensus.com/stations/iowa/eastern-iowa-light-and-power-wapello-office-307845 (data as of October 12, 2026).