Dewey Ford Power Link 2
AvailableEV charging station in Ankeny, Iowa on the ChargePoint network — 2 DC fast. US DOE AFDC station 422931.
At a glance
Dewey Ford Power Link 2 is a public EV charging station at 3055 SE Delaware Ave in Ankeny, Iowa, on the ChargePoint network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Sep 26, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 422931 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 26, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Charles Gabus Ford10 ports
Blink · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Lauridsen Skatepark6 ports
Blink · Available
- 300mlk4 ports
ChargeLab · Available
- 2540 E Euclid Ave4 ports
ChargeLab · Available
What kind of charging does Dewey Ford Power Link 2 offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Dewey Ford Power Link 2 compare with other stations in Ankeny?
Ankeny has 10 charging stations in the DOE registry with 24 ports, the 13th-most of 131 cities and towns in Iowa. Dewey Ford Power Link 2 accounts for 8% of the charging ports in Ankeny. ChargePoint runs 4 stations in Ankeny. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.
Who operates Dewey Ford Power Link 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Iowa, 48% of the state's 528.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 26, 2025, one of 61 stations in Iowa with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Dewey Ford Power Link 2 have?
Dewey Ford Power Link 2 has 2 charging ports: 2 DC fast.
Does Dewey Ford Power Link 2 have DC fast charging?
Yes. The registry lists 2 DC fast ports at Dewey Ford Power Link 2, with CCS connectors.
What connectors does Dewey Ford Power Link 2 have?
Dewey Ford Power Link 2 has CCS connectors.
Is Dewey Ford Power Link 2 open to the public?
Yes. Dewey Ford Power Link 2 is listed with public access, and its status is available.
Where is Dewey Ford Power Link 2?
Dewey Ford Power Link 2 is at 3055 SE Delaware Ave, Ankeny, IA 50021. Its coordinates are 41.69870, -93.57899.
More EV charging around Ankeny
Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 422931, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Dewey Ford Power Link 2, Ankeny, IA (AFDC station 422931)”, https://chargecensus.com/stations/iowa/dewey-ford-power-link-2-422931 (data as of October 12, 2026).