ChargeCensus

Davenport City Hall

Temporarily unavailable

EV charging station in Davenport, Iowa, not on a charging network — 1 Level 2. US DOE AFDC station 156265.

At a glance

Davenport City Hall is a public EV charging station at 226 W 4th St in Davenport, Iowa, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since May 8, 2020.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID156265
NetworkNon-networked
StatusTemporarily unavailable (T)
AccessPublic
FacilityMunicipal government
Open dateMay 8, 2020
Last updated at sourceJul 15, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
226 W 4th St
State
Iowa
ZIP
52801
Coordinates
41.52420, -90.57637

Within ~15 km

Nearby charging

What kind of charging does Davenport City Hall offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a municipal government location.

How does Davenport City Hall compare with other stations in Davenport?

Davenport has 18 charging stations in the DOE registry with 48 ports, the 5th-most of 131 cities and towns in Iowa. Davenport City Hall accounts for 2% of the charging ports in Davenport. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.

Who operates Davenport City Hall?

Davenport City Hall is listed as non-networked: its chargers are not run through a charging-network account. Iowa has 50 non-networked stations, 9% of its total.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on May 8, 2020, one of 37 stations in Iowa with a 2020 open date. The station's record was last updated at the source on Jul 15, 2026.

Frequently asked questions

How many chargers does Davenport City Hall have?

Davenport City Hall has 1 charging port: 1 Level 2.

Does Davenport City Hall have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Davenport City Hall have?

Davenport City Hall has J1772 connectors.

Is charging at Davenport City Hall free?

Pricing as reported to the DOE registry: Free.

Is Davenport City Hall open to the public?

Yes. Davenport City Hall is listed with public access, and its status is temporarily unavailable.

Where is Davenport City Hall?

Davenport City Hall is at 226 W 4th St, Davenport, IA 52801. Its coordinates are 41.52420, -90.57637.

More EV charging around Davenport

Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 156265, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Davenport City Hall, Davenport, IA (AFDC station 156265)”, https://chargecensus.com/stations/iowa/davenport-city-hall-156265 (data as of October 12, 2026).