ChargeCensus

City of Guttenberg

Available

EV charging station in Guttenberg, Iowa on the Blink network — 2 Level 2. US DOE AFDC station 194656.

At a glance

City of Guttenberg is a public EV charging station at 111 Herder Street in Guttenberg, Iowa, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 30, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 1 nearby

Station record

DOE registry record

FieldValue
AFDC station ID194656
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateAug 30, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
111 Herder Street
City
Guttenberg
State
Iowa
ZIP
52052
Coordinates
42.78181, -91.09700

Within ~15 km

Nearby charging

What kind of charging does City of Guttenberg offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”.

How does City of Guttenberg compare with other stations in Guttenberg?

Guttenberg has 2 charging stations in the DOE registry with 6 ports. City of Guttenberg accounts for 33% of the charging ports in Guttenberg. It is the only Blink station in Guttenberg. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.

Who operates City of Guttenberg?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 55 of those stations are in Iowa, 10% of the state's 528.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 30, 2021, one of 72 stations in Iowa with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does City of Guttenberg have?

City of Guttenberg has 2 charging ports: 2 Level 2.

Does City of Guttenberg have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does City of Guttenberg have?

City of Guttenberg has J1772 connectors.

Is charging at City of Guttenberg free?

Pricing as reported to the DOE registry: Free.

Is City of Guttenberg open to the public?

Yes. City of Guttenberg is listed with public access, and its status is available.

Where is City of Guttenberg?

City of Guttenberg is at 111 Herder Street, Guttenberg, IA 52052. Its coordinates are 42.78181, -91.09700.

More EV charging around Guttenberg

Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 194656, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City of Guttenberg, Guttenberg, IA (AFDC station 194656)”, https://chargecensus.com/stations/iowa/city-of-guttenberg-194656 (data as of October 12, 2026).