City Hall
AvailableEV charging station in Bondurant, Iowa on the Blink network — 2 Level 2. US DOE AFDC station 255161.
At a glance
City Hall is a public EV charging station at 200 2nd St NE in Bondurant, Iowa, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 26, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 255161 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 26, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 200 2nd St NE
- City
- Bondurant
- State
- Iowa
- ZIP
- 50035
- Coordinates
- 41.70334, -93.46163
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- 1419 1st Ave N4 ports
ChargeLab · Available
- 2540 E Euclid Ave4 ports
ChargeLab · Available
ChargeLab · Available
- 2930 SE 14th St4 ports
ChargeLab · Available
- Pleasant Hill Hy-Vee4 ports
ChargeLab · Available
What kind of charging does City Hall offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does City Hall compare with other stations in Bondurant?
Bondurant has 1 charging station in the DOE registry with 2 ports. It is the only Blink station in Bondurant. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.
Who operates City Hall?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 55 of those stations are in Iowa, 10% of the state's 528.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 26, 2022, one of 56 stations in Iowa with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does City Hall have?
City Hall has 2 charging ports: 2 Level 2.
Does City Hall have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does City Hall have?
City Hall has J1772 connectors.
Is City Hall open to the public?
Yes. City Hall is listed with public access, and its status is available.
Where is City Hall?
City Hall is at 200 2nd St NE, Bondurant, IA 50035. Its coordinates are 41.70334, -93.46163.
More EV charging around Bondurant
Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 255161, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “City Hall, Bondurant, IA (AFDC station 255161)”, https://chargecensus.com/stations/iowa/city-hall-255161 (data as of October 12, 2026).