Cid Charge Pt Long Term 1
AvailableEV charging station in Cedar Rapids, Iowa on the ChargePoint network — 2 Level 2. US DOE AFDC station 88515.
At a glance
Cid Charge Pt Long Term 1 is a public EV charging station at 2121 Arthur Collins Parkway South West in Cedar Rapids, Iowa, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 18, 2017.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 88515 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 18, 2017 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2121 Arthur Collins Parkway South West
- City
- Cedar Rapids
- State
- Iowa
- ZIP
- 52404
- Coordinates
- 41.89002, -91.69874
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Non-networked · Available
- Junge Ford - Dcfc6 ports
Blink · Available
- JUNGE FORD - Series6 ports
Blink · Available
Turnongreen · Available
Non-networked · Available
What kind of charging does Cid Charge Pt Long Term 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cid Charge Pt Long Term 1 compare with other stations in Cedar Rapids?
Cedar Rapids has 28 charging stations in the DOE registry with 70 ports, the 3rd-most of 131 cities and towns in Iowa. Cid Charge Pt Long Term 1 accounts for 3% of the charging ports in Cedar Rapids. ChargePoint runs 15 stations in Cedar Rapids. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.
Who operates Cid Charge Pt Long Term 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Iowa, 48% of the state's 528.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 18, 2017, one of 12 stations in Iowa with a 2017 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cid Charge Pt Long Term 1 have?
Cid Charge Pt Long Term 1 has 2 charging ports: 2 Level 2.
Does Cid Charge Pt Long Term 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Cid Charge Pt Long Term 1 have?
Cid Charge Pt Long Term 1 has J1772 connectors.
Is Cid Charge Pt Long Term 1 open to the public?
Yes. Cid Charge Pt Long Term 1 is listed with public access, and its status is available.
Where is Cid Charge Pt Long Term 1?
Cid Charge Pt Long Term 1 is at 2121 Arthur Collins Parkway South West, Cedar Rapids, IA 52404. Its coordinates are 41.89002, -91.69874.
More EV charging around Cedar Rapids
Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 88515, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cid Charge Pt Long Term 1, Cedar Rapids, IA (AFDC station 88515)”, https://chargecensus.com/stations/iowa/cid-charge-pt-long-term-1-88515 (data as of October 12, 2026).