ChargeCensus

Ames EV Water Plant

Available

EV charging station in Ames, Iowa on the ChargePoint network — 2 Level 2. US DOE AFDC station 460580.

At a glance

Ames EV Water Plant is a public EV charging station at 1800 East 13th Street in Ames, Iowa, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Jun 3, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID460580
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 3, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1800 East 13th Street
City
Ames
State
Iowa
ZIP
50010
Coordinates
42.03342, -93.58902

Within ~15 km

Nearby charging

What kind of charging does Ames EV Water Plant offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 25% below the Iowa average of 2.7 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; NACS (Tesla), the North American Charging Standard connector.

How does Ames EV Water Plant compare with other stations in Ames?

Ames has 25 charging stations in the DOE registry with 57 ports, the 4th-most of 131 cities and towns in Iowa. Ames EV Water Plant accounts for 4% of the charging ports in Ames. ChargePoint runs 19 stations in Ames. Statewide, Iowa has 528 stations and 1,404 ports, the 33rd-largest station count of the 51 states and DC. The biggest station in Iowa, Wells Fargo West Des Moines Campus in West Des Moines, has 24 ports.

Who operates Ames EV Water Plant?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Iowa, 48% of the state's 528.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 3, 2026, one of 53 stations in Iowa with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ames EV Water Plant have?

Ames EV Water Plant has 2 charging ports: 2 Level 2.

Does Ames EV Water Plant have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Ames EV Water Plant have?

Ames EV Water Plant has J1772 and NACS (Tesla) connectors.

Is Ames EV Water Plant open to the public?

Yes. Ames EV Water Plant is listed with public access, and its status is available.

Where is Ames EV Water Plant?

Ames EV Water Plant is at 1800 East 13th Street, Ames, IA 50010. Its coordinates are 42.03342, -93.58902.

More EV charging around Ames

Working with Iowa charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 460580, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ames EV Water Plant, Ames, IA (AFDC station 460580)”, https://chargecensus.com/stations/iowa/ames-ev-water-plant-460580 (data as of October 12, 2026).