ChargeCensus

Switchyard Park

Available

EV charging station in Bloomington, Indiana, not on a charging network — 4 Level 2. US DOE AFDC station 256936.

At a glance

Switchyard Park is a public EV charging station at 1601 S Rogers St in Bloomington, Indiana, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 4, 2022.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID256936
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityPark
Open dateOct 4, 2022
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
1601 S Rogers St
State
Indiana
ZIP
47403
Coordinates
39.14757, -86.53773

Within ~15 km

Nearby charging

What kind of charging does Switchyard Park offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 23% above the Indiana average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a park location.

How does Switchyard Park compare with other stations in Bloomington?

Bloomington has 36 charging stations in the DOE registry with 125 ports, the 3rd-most of 148 cities and towns in Indiana. Switchyard Park accounts for 3% of the charging ports in Bloomington. Statewide, Indiana has 815 stations and 2,650 ports, the 25th-largest station count of the 51 states and DC. The biggest station in Indiana, Lafayette In Sdc in Lafayette, has 112 ports.

Who operates Switchyard Park?

Switchyard Park is listed as non-networked: its chargers are not run through a charging-network account. Indiana has 110 non-networked stations, 13% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 4, 2022, one of 110 stations in Indiana with a 2022 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Switchyard Park have?

Switchyard Park has 4 charging ports: 4 Level 2.

Does Switchyard Park have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Switchyard Park have?

Switchyard Park has J1772 connectors.

Is charging at Switchyard Park free?

Pricing as reported to the DOE registry: Free.

Is Switchyard Park open to the public?

Yes. Switchyard Park is listed with public access, and its status is available.

Where is Switchyard Park?

Switchyard Park is at 1601 S Rogers St, Bloomington, IN 47403. Its coordinates are 39.14757, -86.53773.

More EV charging around Bloomington

Working with Indiana charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 256936, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Switchyard Park, Bloomington, IN (AFDC station 256936)”, https://chargecensus.com/stations/indiana/switchyard-park-256936 (data as of October 12, 2026).