Hubler Nissan
AvailableEV charging station in Indianapolis, Indiana, not on a charging network — 1 DC fast · 1 Level 2. US DOE AFDC station 47154.
At a glance
Hubler Nissan is a public EV charging station at 8435 US Highway 31 in Indianapolis, Indiana, not attached to a charging network. It has 2 charging ports (1 DC fast · 1 Level 2) with CHAdeMO and J1772 connectors. The US DOE registry lists it as available, open since Jan 31, 2012.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 47154 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Car dealership |
| Open date | Jan 31, 2012 |
| Last updated at source | Feb 12, 2025 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 8435 US Highway 31
- City
- Indianapolis
- State
- Indiana
- ZIP
- 46227
- Coordinates
- 39.64479, -86.13180
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Professional Office Building16 ports
Non-networked · Available
Tesla Supercharger · Available
Electrify America · Available
Tesla Supercharger · Available
Tesla Destination · Available
What kind of charging does Hubler Nissan offer?
Of its 2 ports, 1 is DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 38% below the Indiana average of 3.3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector. The site is listed as a car dealership location.
How does Hubler Nissan compare with other stations in Indianapolis?
Indianapolis has 95 charging stations in the DOE registry with 314 ports, the most of 148 cities and towns in Indiana. Hubler Nissan accounts for under 1% of the charging ports in Indianapolis. Statewide, Indiana has 815 stations and 2,650 ports, the 25th-largest station count of the 51 states and DC. The biggest station in Indiana, Lafayette In Sdc in Lafayette, has 112 ports.
Who operates Hubler Nissan?
Hubler Nissan is listed as non-networked: its chargers are not run through a charging-network account. Indiana has 110 non-networked stations, 13% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 31, 2012, one of 23 stations in Indiana with a 2012 open date. The station's record was last updated at the source on Feb 12, 2025.
Frequently asked questions
How many chargers does Hubler Nissan have?
Hubler Nissan has 2 charging ports: 1 DC fast · 1 Level 2.
Does Hubler Nissan have DC fast charging?
Yes. The registry lists 1 DC fast port at Hubler Nissan, with CHAdeMO connectors.
What connectors does Hubler Nissan have?
Hubler Nissan has CHAdeMO and J1772 connectors.
Is Hubler Nissan open to the public?
Yes. Hubler Nissan is listed with public access, and its status is available.
Where is Hubler Nissan?
Hubler Nissan is at 8435 US Highway 31, Indianapolis, IN 46227. Its coordinates are 39.64479, -86.13180.
More EV charging around Indianapolis
Working with Indiana charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 47154, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hubler Nissan, Indianapolis, IN (AFDC station 47154)”, https://chargecensus.com/stations/indiana/hubler-nissan-47154 (data as of October 12, 2026).