ChargeCensus

Waubonsee Cc Wccsgtec01

Available

EV charging station in Sugar Grove, Illinois on the ChargePoint network — 1 Level 2. US DOE AFDC station 428702.

At a glance

Waubonsee Cc Wccsgtec01 is a public EV charging station at 4S783 Illinois 47 in Sugar Grove, Illinois, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 4, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID428702
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 4, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
4S783 Illinois 47
City
Sugar Grove
ZIP
60554
Coordinates
41.79142, -88.45743

Within ~15 km

Nearby charging

What kind of charging does Waubonsee Cc Wccsgtec01 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Illinois average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Waubonsee Cc Wccsgtec01 compare with other stations in Sugar Grove?

Sugar Grove has 1 charging station in the DOE registry with 1 ports. It is the only ChargePoint station in Sugar Grove. Statewide, Illinois has 2,056 stations and 7,047 ports, the 14th-largest station count of the 51 states and DC. The biggest station in Illinois, Hanover Park Il Sdc in Hanover Park, has 110 ports.

Who operates Waubonsee Cc Wccsgtec01?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 942 of those stations are in Illinois, 46% of the state's 2,056.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 4, 2025, one of 447 stations in Illinois with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Waubonsee Cc Wccsgtec01 have?

Waubonsee Cc Wccsgtec01 has 1 charging port: 1 Level 2.

Does Waubonsee Cc Wccsgtec01 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Waubonsee Cc Wccsgtec01 have?

Waubonsee Cc Wccsgtec01 has J1772 connectors.

Is Waubonsee Cc Wccsgtec01 open to the public?

Yes. Waubonsee Cc Wccsgtec01 is listed with public access, and its status is available.

Where is Waubonsee Cc Wccsgtec01?

Waubonsee Cc Wccsgtec01 is at 4S783 Illinois 47, Sugar Grove, IL 60554. Its coordinates are 41.79142, -88.45743.

More EV charging around Sugar Grove

Working with Illinois charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 428702, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Waubonsee Cc Wccsgtec01, Sugar Grove, IL (AFDC station 428702)”, https://chargecensus.com/stations/illinois/waubonsee-cc-wccsgtec01-428702 (data as of October 12, 2026).