Suite Dreams Hotel
AvailableEV charging station in Mattoon, Illinois, not on a charging network — 1 Level 2. US DOE AFDC station 158361.
At a glance
Suite Dreams Hotel is a public EV charging station at 300 Broadway Ave E in Mattoon, Illinois, not attached to a charging network. It has 1 charging port (1 Level 2) with NACS (Tesla) connectors. The US DOE registry lists it as available, open since May 29, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 158361 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Hotel |
| Open date | May 29, 2020 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: Free
Within ~15 km
Nearby charging
- Emerald Acres Shoppes4 ports
Blink · Available
- KC Summers Nissan2 ports
Non-networked · Available
Blink · Available
- Pilson Ford-L32 ports
Blink · Available
- Emerald Acres Unit 22 ports
ChargePoint · Available
- Lake Land Colle Power House2 ports
ChargePoint · Available
What kind of charging does Suite Dreams Hotel offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Illinois average of 3.4 ports per station. The registry lists one connector type: NACS (Tesla), the North American Charging Standard connector. Pricing as reported to the registry: “Free”. The site is listed as a hotel location.
How does Suite Dreams Hotel compare with other stations in Mattoon?
Mattoon has 20 charging stations in the DOE registry with 37 ports, the 15th-most of 333 cities and towns in Illinois. Suite Dreams Hotel accounts for 3% of the charging ports in Mattoon. Statewide, Illinois has 2,056 stations and 7,047 ports, the 14th-largest station count of the 51 states and DC. The biggest station in Illinois, Hanover Park Il Sdc in Hanover Park, has 110 ports.
Who operates Suite Dreams Hotel?
Suite Dreams Hotel is listed as non-networked: its chargers are not run through a charging-network account. Illinois has 197 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 29, 2020, one of 84 stations in Illinois with a 2020 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Suite Dreams Hotel have?
Suite Dreams Hotel has 1 charging port: 1 Level 2.
Does Suite Dreams Hotel have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Suite Dreams Hotel have?
Suite Dreams Hotel has NACS (Tesla) connectors.
Is charging at Suite Dreams Hotel free?
Pricing as reported to the DOE registry: Free.
Is Suite Dreams Hotel open to the public?
Yes. Suite Dreams Hotel is listed with public access, and its status is available.
Where is Suite Dreams Hotel?
Suite Dreams Hotel is at 300 Broadway Ave E, Mattoon, IL 61938. Its coordinates are 39.48299, -88.34533.
More EV charging around Mattoon
Working with Illinois charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 158361, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Suite Dreams Hotel, Mattoon, IL (AFDC station 158361)”, https://chargecensus.com/stations/illinois/suite-dreams-hotel-158361 (data as of October 12, 2026).