ChargeCensus

Rosen Group Cpe250 2

Available

EV charging station in Algonquin, Illinois on the ChargePoint network — 1 DC fast. US DOE AFDC station 346402.

At a glance

Rosen Group Cpe250 2 is a public EV charging station at 789 S Randall Rd in Algonquin, Illinois, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since May 17, 2024.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID346402
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 17, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
789 S Randall Rd
City
Algonquin
ZIP
60102
Coordinates
42.16208, -88.33421

Within ~15 km

Nearby charging

What kind of charging does Rosen Group Cpe250 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 71% below the Illinois average of 3.4 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Rosen Group Cpe250 2 compare with other stations in Algonquin?

Algonquin has 6 charging stations in the DOE registry with 22 ports. Rosen Group Cpe250 2 accounts for 5% of the charging ports in Algonquin. ChargePoint runs 4 stations in Algonquin. Statewide, Illinois has 2,056 stations and 7,047 ports, the 14th-largest station count of the 51 states and DC. The biggest station in Illinois, Hanover Park Il Sdc in Hanover Park, has 110 ports.

Who operates Rosen Group Cpe250 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 942 of those stations are in Illinois, 46% of the state's 2,056.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 17, 2024, one of 277 stations in Illinois with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Rosen Group Cpe250 2 have?

Rosen Group Cpe250 2 has 1 charging port: 1 DC fast.

Does Rosen Group Cpe250 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Rosen Group Cpe250 2, with CHAdeMO and CCS connectors.

What connectors does Rosen Group Cpe250 2 have?

Rosen Group Cpe250 2 has CHAdeMO and CCS connectors.

Is Rosen Group Cpe250 2 open to the public?

Yes. Rosen Group Cpe250 2 is listed with public access, and its status is available.

Where is Rosen Group Cpe250 2?

Rosen Group Cpe250 2 is at 789 S Randall Rd, Algonquin, IL 60102. Its coordinates are 42.16208, -88.33421.

More EV charging around Algonquin

Working with Illinois charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 346402, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Rosen Group Cpe250 2, Algonquin, IL (AFDC station 346402)”, https://chargecensus.com/stations/illinois/rosen-group-cpe250-2-346402 (data as of October 12, 2026).